1. Definitions
“Contractor” means Skilled Roofing Limited.
“Client” means the person or company accepting the quotation.
“Works” means all roofing and associated works detailed in the quotation.
⸻
2. Quotations & Acceptance
a) All quotations are valid for 3 months from the date issued unless stated otherwise.
b) All prices are nett and exclusive of VAT, unless otherwise stated.
c) Acceptance of a quotation constitutes acceptance of these Terms & Conditions.
d) Work will not be scheduled or commenced until acceptance is received (written or email confirmation may be required).
⸻
3. Variations & Additional Works
a) Any variations, additions, or changes to the agreed Works must be approved by the Contractor.
b) All variations will be confirmed in writing or by email and may incur additional charges.
c) The Contractor reserves the right to carry out and charge for essential additional works required to complete the job safely or correctly.
⸻
4. Unforeseen Works
a) Roofing works may expose hidden defects once work has commenced.
b) The Contractor reserves the right to revise the contract price where unforeseen issues arise, including but not limited to:
• Rotten or damaged timbers
• Defective battens or felt
• Structural issues
c) The Client will be informed before such works proceed where reasonably possible.
⸻
5. Payment Terms
a) Unless otherwise agreed in writing, full payment is due immediately upon completion of the Works.
b) The Contractor may require:
• A deposit of up to 50% prior to commencement
• Stage payments where applicable
c) The Contractor reserves the right to suspend works if any payment is not made when due.
d) All invoices must be paid within 7 days unless otherwise agreed in writing.
⸻
6. Late Payment
a) Interest will be charged on overdue amounts at HSBC base rate + 8%, in accordance with the Late Payment of Commercial Debts legislation.
b) The Client shall be responsible for all reasonable costs incurred in recovering overdue payments, including legal and debt collection fees.
⸻
7. VAT
VAT will be charged at the prevailing rate at the time of invoicing.
⸻
8. Programme & Timing
a) Any dates provided for commencement or completion are estimates only and not contractually binding.
b) Roofing works are weather dependent, and the Contractor reserves the right to delay or reschedule works due to unsuitable conditions without liability.
⸻
9. Access, Services & Client Responsibilities
The Client must ensure:
• Safe and adequate access to the site
• Availability of electricity, water, and toilet facilities
• Notification to insurers of the works
• Any required neighbour permissions are obtained
• Any obstructions (e.g. satellite dishes, aerials) are removed
Failure to meet these requirements may result in delays and additional charges.
⸻
10. Scaffolding & Access Equipment
Where scaffolding or access equipment is required:
• Costs may be charged separately unless stated otherwise
• Any delays caused by access issues or third parties may be chargeable
⸻
11. Materials & Ownership
a) All materials remain the property of the Contractor until paid for in full.
b) The Contractor reserves the right to remove materials if payment is not made.
c) Any surplus materials remain the property of the Contractor unless agreed otherwise.
d) All salvage materials (e.g. lead, tiles) become the property of the Contractor.
⸻
12. Samples
Samples are provided for general guidance only. The Contractor does not guarantee an exact match in colour, texture, or size.
⸻
13. Measurements
Where measurements are provided by the Client, the Contractor reserves the right to adjust the quotation if inaccuracies are identified.
⸻
14. Consents & Approvals
The Client is responsible for obtaining:
• Planning permission
• Building regulations approval
• Any other statutory consents
unless otherwise agreed in writing.
⸻
15. Building Regulations (Re-Roofing Works)
a) In accordance with current Building Regulations, the replacement of more than 25% of a roof covering is notifiable work and may require approval from the local authority or certification via a competent person scheme.
b) Unless expressly agreed in writing, the Client is solely responsible for:
• Notifying the local authority Building Control
• Obtaining any required approvals or inspections
• Paying any associated fees
c) Where the Contractor is requested to arrange Building Regulations approval or certification, this must be agreed in writing prior to commencement and will be subject to additional charges.
d) The Contractor accepts no responsibility or liability for:
• Failure by the Client to obtain Building Regulations approval
• Any enforcement action taken by the local authority
• Any issues arising during the sale, remortgage, or survey of the property due to non-compliance
⸻
16. Health & Safety
The Contractor reserves the right to withdraw operatives if:
• The site is unsafe
• Conditions breach health and safety regulations
• Weather conditions are unsuitable
⸻
17. Hazardous Materials
If hazardous materials (including asbestos) are discovered:
• Works may be suspended immediately
• Additional costs will apply
• The Contractor is not responsible for removal unless agreed in writing
⸻
18. Contractor Responsibilities
a) All materials used will comply with relevant British Standards where applicable.
b) The Contractor is responsible for the Works as specified only.
c) No responsibility is accepted for:
• Chimney defects unless specifically included
• Water ingress through brickwork where no lead tray is installed
• Pre-existing defects or deterioration
⸻
19. Liability
a) The Contractor shall not be liable for:
• Indirect or consequential losses
• Loss of earnings or inconvenience
b) The Contractor’s total liability shall not exceed the contract value.
c) The Contractor does not undertake structural assessments unless agreed in writing.
⸻
20. Completion
Works are deemed complete when:
• The roof is watertight and fit for purpose
• Minor snagging items do not affect performance
⸻
21. Guarantees
Any workmanship guarantee provided:
• Applies only to the specified Works
• Is subject to proper maintenance and no third-party interference
• Does not cover damage caused by external factors (e.g. storms, impact, structural movement)
⸻
22. Site Readiness
If the Contractor is unable to commence or continue works due to site conditions, a charge of £50 + VAT minimum may apply, along with any additional costs incurred.
⸻
23. Insolvency
If the Client becomes insolvent, the Contractor may:
• Cease works immediately
• Cancel the contract without liability
⸻
24. Force Majeure
The Contractor shall not be liable for delays or failure due to events beyond its control, including:
• Weather
• Material shortages
• Strikes
• Accidents
⸻
25. Right to Refuse or Suspend Work
The Contractor reserves the right to:
• Refuse work
• Suspend works or deliveries
where payment terms or creditworthiness are unsatisfactory.
⸻
26. Dispute Resolution
Any dispute may be referred to adjudication under:
• The Housing Grants, Construction and Regeneration Act 1996
• The Scheme for Construction Contracts
An adjudicator shall be appointed by the Royal Institution of Chartered Surveyors (RICS).